The Utilities Plants, established in 1987, form the backbone of our operations by providing essential services and resources to all production units.

Utilities Plant
Utilities Plant
Utilities Plant
Initial Setup (1987)
Water Treatment
  • Two water intake pumps (1250 m³/hr each)
  • One clarifier (2000 m³)
  • Two sand filters (325 m³/hr each)
Cooling System
  • Cooling tower 15000 m³/hr (5 cells)
Water Processing
  • Two RO units (190 m³/hr each)
  • Two Demineralized lines (150 m³/hr each)
  • Two Demineralized lines (22 m³/hr each)
Industrial Systems
  • Two water tube boilers (45 ton/hr each)
  • Three air compressors (3000 Nm³/hr each)
  • Three air compressors (1800 Nm³/hr each)
  • Nitrogen plant (240 Nm³/hr Gas & 60 m³/hr liquid)
Current Utilities
Water Treatment
  • Three water intake pumps (1250 m³/hr each)
  • Two clarifiers (2000 m³ & 3000 m³)
  • Seven sand filters (325 m³/hr & 300 m³/hr)
  • Three carbon filters (150 m³/hr each)
  • Cooling tower with seven cells
Processing & Industrial Systems
  • Two RO units (190 m³/hr each)
  • Three Demineralized lines (150 m³/hr each)
  • Two Demineralized lines (22 m³/hr each)
  • Two water tube boilers (45 ton/hr each)
  • Four air compressors (3000 Nm³/hr & 7000 Nm³/hr)
  • Three air compressors (1800 Nm³/hr each)
  • Nitrogen plant (240 Nm³/hr Gas & 60 m³/hr liquid)
New Project

Six sand filters (200 m³/hr each) producing 1000 m³/hr filtered water for Egyptian Ethylene and Polyethylene Company (ETHYDCO)

Major Upgrades Timeline
Upgrades
Upgrades
Upgrades
Upgrades

1998: Installation of Demineralized water line (150 m³/hr)

1999: Installation of five sand filters (300 m³/hr each)

2003: Installation of three carbon filters, two micron filters, and two cooling tower cells

2004: Installation of air compressor (7000 Nm³/hr), clarifier (3000 m³), and control system upgrade

2015: Installation of water intake pump and new filtered water project for ETHYDCO